Road Closures and Obstructions

Road Closures

Monday, May 6, 2019 to Monday, July 15, 2019

A temporary road closure is in place to facilitate the completion of a new southbound travel lane. The road was originally scheduled to reopen on June 10, 2019; however, given the extension to complete the Phase 1 works prior to the next phase of road widening, the temporary road closure will now be in effect for 24 hours a day until Monday July 15, 2019.

  • 192 Street: 40 Avenue to 48 Avenue.

Detour map

Monday, June 3, 2019 to Friday, July 26, 2019 from 7am to 5pm

A temporary road closure will be in place to facilitate the roadworks as part of Land Development Project 7816-0685-00.

  • 126A Street: 110 Avenue to 110A Avenue (Future Road).

Detour map

Monday, June 10, 2019 to Tuesday, December 31, 2019 from 7am to 10pm

A temporary road closure will be in place to facilitate the positioning of a mobile concrete pump and trucks on 137A Street for a development project site. Due to the footprint of the construction vehicles, intermittent closures will be required. The frequency of the closures is expected to be one to three days per week.

  • 137A Street: 96 Avenue to 97A Avenue.

Detour map

Monday, June 17 to Friday, August 31, 2019

A temporary road closures will be in place 24 hours a day to facilitate the installation of a water main. The first affected area will be:

  • 148 Street from 96 Avenue to 100 Avenue

Detour map

Thursday, July 4 to Friday, August 30, 2019 from 7am to 7pm

A temporary road closure will be in place to facilitate the completion of roadwork, including installation of a new raised median.

  • 144 Street: 88 Avenue to 89A Avenue.

Detour map

Monday, July 8 to Friday, July 12, 2019 from 9am to 3pm

A temporary road closure will be in place to facilitate the installation of a storm and sanitary main, as per Land Development Project No. 7816-0158-00.

  • 72 Avenue Westbound: 193 Street to 194A Street.

Detour map

Monday, July 8 to Friday, July 26, 2019 from 7am to 7pm

A temporary road closure will be in place to facilitate the installation of storm and sanitary mains as part of Land Development Project No. 7817-0402-00.

  • Venture Way: Fraser Highway to 84 Avenue.

Detour map

Monday, July 8 to Friday, July 26, 2019 from 7am to 7pm

A temporary one-directional road closure will be in place to facilitate the grinding and repaving of the existing two-lane road. Due to the to the narrow road width, it will not be possible to maintain two travelled lanes in each direction while the roadworks are taking place, and as a result, it will be necessary to close one direction of traffic during construction. The work will be completed in two phases. Phase 1 will consist of road paving along the east side of 188 Street. During this time, the traffic in the northbound direction along 188 Street will be closed. Phase 2 will consist of road paving along the west side of 188 Street. During this time, traffic in the southbound direction along 188 Street will be closed.

  • 188 Street: Highway #10 to 60 Avenue.

Detour map

Saturday, July 13 to Wednesday, July 31, 2019

A temporary road closure will be in place to facilitate the removal of the entire road surface and repaving.

  • 108 Avenue: University Drive to King George Boulevard.

Detour map

Monday, July 15 to Tuesday, July 16, 2019

A temporary road closure will be in place to facilitate the installation of a 1,500mm diameter water main.

  • Wellington Drive: East of Surrey Road.

Detour map

Monday, July 15 to Friday, August 9, 2019

A temporary road closure will be in place to facilitate roadworks on Central Avenue, including paving and reconstruction of existing sidewalks and pedestrian crossings to suit the ultimate road corridor.

  • Central Avenue: City Parkway to Civic Plaza Lane.

Detour map

Saturday, July 27, 2019 from 8am to 4pm

A temporary road closure will be in place to facilitate the Cloverdale Market Days.

  • 176 Street between 56A Avenue and 58 Avenue;
  • 57 Avenue between 176 Street and 1778 Street.

Detour map

Saturday, August 24, 2019 from 8am to 4pm

A temporary road closure will be in place to facilitate the Cloverdale Market Days.

  • 176 Street between 56A Avenue and 58 Avenue;
  • 57 Avenue between 176 Street and 1778 Street.

Detour map

Saturday, September 21, 2019 from 8am to 4pm

A temporary road closure will be in place to facilitate the Cloverdale Market Days.

  • 176 Street between 56A Avenue and 58 Avenue;
  • 57 Avenue between 176 Street and 1778 Street.

Detour map

Road Obstructions Map

Use this map to see active and future obstructions and detours happening throughout the City. It is updated every 5 minutes.

How to Use this Map

Red areas show current closures and obstructions happening throughout the City and our suggested detour route. Yellow areas show closures and obstructions planned for the next three weeks.

Follow @SurreyTraffic

Follow the City's traffic Twitter account to find out about major traffic alerts from the Traffic Management Centre. Tweets are from Monday to Friday 6:30am to 6:30pm